  • Pre-Announcement of Partial Amendment to the Enforcement Rule of the Electrical Safety Management Act
    • Competent Ministry : Ministry of Trade, Industry and Energy
    • Advance Publication of Legislation : 2022-11-17
    • Opinion Submission Deadline : 2022-12-31

1. Reasons for Amendment


Prevent safety accidents by strengthening the safety management of uninterruptible power supplies in blind spots for safety management among electrical equipment



2. Major Provisions


A. Establish a new definition of the term for power generation facilities* and strengthen safety management by adding the uninterruptible power supply to the approval and reporting of the private electric facility construction plan, pre-use inspection** and regular inspection***


* (Newly Inserted) Add the definition of the term “power generation facility” in Article 2 subparagraph 7 and include in the construction plan report in the same way as the electricity storage device even if the uninterruptible power supply under Article 3 (2) is low voltage


** (Amended) [Attached table 1] Add “uninterruptible power supply” to the approval and reporting of the private electric equipment construction plan


(Amended) [Attached table 2] Add “uninterruptible power supply” to the method of applying for and reporting the approval of the private electric equipment construction plan


(Amended) [Attached table 3] Add “uninterruptible power supply” at the time of pre-use inspection


*** (Amended) [Attached table 4] Add “uninterruptible power supply” to electrical facilities and timing subject to regular inspection (1-2 years)


Regulatory effect assessment
  • 전기안전관리법 시행규칙(규제영향분석서)_20221114.hwp [download]
Legislative proposal (draft)
  • 입법예고문(전기안전관리법 시행규칙).hwp [download]