skip to main contents skip to main menu

Government Legislation

  • Partial Amendment to the Enforcement Rule of the Act on the Integrated Control of Pollutant-Discharging Facilities
    • Competent Ministry : Ministry of Environment
    • Advance Publication of Legislation : 2023-05-22
    • Opinion Submission Deadline : 2023-06-30

​1. Reasons for Amendment

The Amendment specifies the installation, management, and action standards for discharging facilities, etc. and prevention facilities, standards for the measurement and survey of pollutants, maximum discharge standards, and other standards necessary for the enforcement of the system in relation to cement manufacturing businesses, which will be added to the types of businesses subject to integrated control of pollutant-discharging facilities as of July 2023.



2. Major Provisions

A. Add concentration limits for new pollutants subject to revised permits and revised reports in accordance with amendments to other laws (attached Table 3)

The Amendment adds concentration limits for specified substances harmful to water quality added in accordance with amendments to [Table 3] of the Enforcement Rule of the Water Environment Conservation Act, etc.


B. Add installation, management, and action standards for discharging facilities, etc. and prevention facilities (attached Table 12), standards for the measurement and survey of pollutants (attached Table 13), and maximum discharge standards (attached Table 15)

The Amendment prescribes facility management standards, standards for the measurement and survey of pollutants, and maximum discharge standards appropriate for cement manufacturing businesses as they have been newly added to the types of businesses subject to integrated control and it is necessary to prepare various specific standards required for permits.

Regulatory effect assessment
  • 환경오염시설의 통합관리에 관한 법률 시행규칙(규제영향분석서)_20230517.hwp [download]
Legislative proposal (draft)
  • (환경부공고2023-335호)「환경오염시설의 통합관리에 관한 법률 시행규칙」 일부개정령(안) 입법예고.hwp [download]