1. Reason for the Revision
The revision aims to complement the deficiencies identified in the operation of the current system, including facility management to reduce fugitive emissions of hazardous air pollutants.
2. Main Contents
a. Improvement of the facility management guidelines for reducing fugitive emissions (attached Table 10-2 of the draft)
In the event of any abnormal operation of measuring equipment, etc. during the continuous monitoring of the total calorific value of flare stacks, the cause of the abnormality, individualized plans, etc. should be reported to the competent authorities, and the results of subsequent equipment actions should be attached to the annual inspection report.